Tecnofreddo

_ Preventive maintenance checklist

Ten minutes now. Or a shutdown later.

25 checks that catch a chiller fault before it turns into a Sunday call-out. Instruments, limits and intervals already worked out for you.

Get the checklist
Free PDF Printable A4 No sign-up
_ Preventive maintenance · Chiller
Monthly inspection · plant room
✓ Compressor current draw 42.8 A
✓ Evaporating temperature 1.4 °C
Discharge pressure 19.2 bar
Condenser condition —
Alarms, last 30 days —
Safety valve seals —
page 1 / 4 25 checks
25
Checks · 5 areas
10 min
Per chiller
4
Intervals already set

_ The problem

A chiller doesn't stop out of the blue

It stops after weeks of numbers that were already telling you something. Nobody was reading them the same way, or reading them at all.

→ Every technician checks something different, so no two visits can be compared
→ Head pressure climbs for weeks before the high-pressure switch finally trips
→ Recurring alarms get reset instead of logged
→ The call comes on a Sunday, and by then the job costs 4.8 times what it would have on a planned visit

_ What's inside

Your inspection round, already planned

25

Checks in 5 areas

Power draw, condenser, temperatures, alarms, safety valve seals: where a fault starts long before anyone hears it.

What to measure, and where the limit is

Each check comes with the instrument to use and the value that should worry you. Numbers, not vague instructions.

Intervals already set

Weekly, monthly, six-monthly, yearly. Your whole preventive plan on one A4 sheet: what to do, and when.

Made for the plant room, not the filing cabinet

Big type, tick boxes you can fill in with a pen. Works on paper or on a tablet, offline, no sign-up.

_ Why it works

What changes after the first visit

You see the fault weeks earlier

Head pressure creeping up, COP creeping down, an alarm that keeps coming back: you catch the numbers before the chiller stops.

Fewer out-of-hours call-outs

An emergency call-out on a chiller costs many times more than a scheduled check, and that's before you count the product at risk.

Readings you can actually compare

Everyone works through the same 25 items with the same limits. Put March next to September and the trend is right there.

_ How it works

Three steps to your first inspection

01

Fill in the form

Name, work email, company, sector. We ask for your sector so we know what kind of machines you run. That's all we use it for.

02

Confirm, and the PDF is yours

One confirmation email, one click, and it's in your inbox: ready to print on A4 or open on a tablet. No app, no account.

03

Do your first inspection today

25 items, each with its instrument and its limit. From the second visit on you have a trend, not just a reading.

_ Get it now

Your first inspection is this afternoon

One confirmation email, one click, and the PDF is in your inbox: printable A4, or ready for a tablet. Your sector tells us what kind of machines you run. We use it for nothing else.

GDPR compliant · Unsubscribe in one click · No sales calls

So we know what kind of machines you run.

_ FAQ

What people ask us before they download it

Is it really free? Even if we're not a Tecnofreddo customer? +

Yes. It's the same checklist we use with our own customers; we've simply opened it up to anyone who works with industrial refrigeration. No cost, no sales call. If you ever need a hand with a chiller, you'll know where to find us.

Is it only for chillers, or for other refrigeration machines too? +

It's written for vapour-compression chillers with screw or scroll compressors. The same checks (evaporating and condensing temperatures, superheat, subcooling, current draw) apply to multi-compressor units and water-to-water machines. On transcritical CO₂ and ammonia some of the limits are different.

How long does it take to go through on the machine? +

Eight to twelve minutes per chiller, once you know where to find each parameter on the controller. Allow twenty the first time, while you get your bearings on the machine.

Can I share it with my team or my service contractors? +

Yes, go ahead. Print it, put it in your CMMS, attach it to the service report. The only thing we ask is that you don't resell it.

Will you see the next shutdown coming?

Get it now and do your first inspection this afternoon.

Get the checklist

No sales calls. Just the PDF.